Insurance / Latest News
  Insurance
   Engineering
   Fire Insurance
   General Accident & Liability Insurance
   Personal Accident & Life Insurance
   Marine
More...
  Latest News



   Announcement of AGM to be held on 27th March 2017


   Q4 2016 Financial results


   Corporate governance report 2015


   SICO BOD Report -3rd Qtr'10


   SICO 3rd Qtr Results
 
Contractor's All Risks Insurance
Concept: To provide necessary financial protection in the Owners &/or the Contractors, executing a "project", if such a project should require repair, replacement or reinstatement, as a result of it being subject to a sudden and unforeseen physical loss or damage during its execution &/or maintenance.  

The Scope of Cover: The policy indemnifies the "Insured" named in the Policy, for monetary losses, suffered by the insured as a result of loss or material damage to the insured, arising from every risk not specifically excluded. The Policy also provides indemnity towards Third Party Claims (for Bodily injury or Property Damage) up to the Limit chosen and specified under Section II of the Policy.  

Interests Covered: "Contract Works" (which would include all costs of materials to be incorporated therein), all temporary and permanent works to be executed in performance of the "project" including such associated property belonging to the Owners (Principals Existing Property-PEP); Contractors Plant, Equipment and Machinery, at the Project Site are also coverable. Reasonable costs for "Debris Removal", "Architects/Consultants Fees", and "Air freight", "Overtime and Night works" following an "accident", can be covered.  

Premium Rating: Rate per thousand on total contract value is charged depending on the nature and type of contractual works, extent and period of coverage, deductible agreed, claims experience of contractor, method of operation, conditions at the work site, type of equipment.  

Some Exclusions  
War or Warlike Operations  
Willful negligence or willful acts  
Nuclear reaction, radiation or contamination  
Consequential losses of any kind.  
Losses due to delays, fines and penalties  
Loss or damage to Construction Plant/Equipment and Machinery due to Electrical or Mechanical Breakdown etc.
Sabotage & Terrorism exclusion.